Specify real fire in 5 minutes.
Official CAD files, data sheets and manuals from each manufacturer, trade pricing and a technician who reviews your plan.
Technical library
2D DWG, data sheets and manuals ready for your project. BIM on request.
Trade pricing
Studio terms once your account is validated, within 24 working hours.
Project support
Send us the plan: we return the model, opening and ventilation within 48 h.
Presentation for studios
45 minutes at your studio (Balearics) or by video, with samples.
Official technical files
The first download only asks for an email: that way we know which project it is for and can tell you when there is a new version.
| Model | Files |
|---|---|
| FLA4 990Planika. Automatic linear burner | |
| FLA4 1490Planika. Automatic linear burner | |
| FLA4 1990Planika. Automatic linear burner | |
| Neo Fireplace 1000Planika. Built-in firebox | |
| Neo Fireplace 750Planika. Built-in firebox | |
| Forma 1500 IslandPlanika. Glass-fronted fireplace, FLA4 |
Links to the manufacturer's public library (Planika).
Your professional account in 24 h
Fill in your details. We validate the account and send you trade prices, BIM access and the contact of your assigned technician.
- Studio pricesVisible when you log in, with quotes as PDF.
- An assigned technicianThe same contact person on all your projects.
- Samples and showroomBring your client, or we bring the flame to your studio.
Send the plan, get the solution
So specifying fire doesn't cost you a week of emails.
Upload a plan or render
DWG, PDF or a photo of the space with approximate measurements.
5 minutesTechnical review
Recommended model, opening, ventilation and minimum room volume.
48 hQuote for your client
PDF with your logo, trade price and options.
Same dayCoordinated installation
We coordinate with the build and commission the fireplace.
Fixed date
Fire with no flue: what your team should know
A 45-minute technical session for your studio, in the Balearics or by video call. With a real flame if you visit the showroom.
- Bioethanol, electric, vapour and gas: when to use each
- Minimum room volume, ventilation and zero clearance
- Construction details of the opening and maintenance
- Hotel and home case studies with FLA4 and Forma